COMMERCIAL ENERGY PROPOSAL • 17 AUG 2024

Turn charging visits into customer value.Turn charging visits into customer value.

Our goal is to make EV charging a natural extension of the Kneaders guest experience—serving current guests, attracting new ones, and giving drivers a warm, welcoming place to spend their charging time. In doing so, the project can create measurable restaurant visits and sales while adding a valuable new amenity to the property.Kneaders Bakery & Cafe | 1960 N State Street, Orem, Utah | Proposed 8-port DC fast-charging station

Esri aerial imagery of the Kneaders Bakery & Cafe property
03 / CHARGER LAYOUT

Draw the build plan.

Start from the site satellite view. Place equipment, then draw the trench, conduit, striping, and access routes the construction team should follow.
Drag objects onto the map · click Line to draw
01 / SITE SNAPSHOT

One site. Three levers.

The system is sized around how this store actually operates — long retail hours, a big refrigeration load, and a parking lot that stays busy.
AMERICAN FORK, UT 40.3769° N · 111.7958° W
Walmart Supercenter 5179
Solar array Battery EV chargers
Store footprint182,400 sq ft
Annual utility spend$312,800 / yr
Peak demand1,240 kW
Operating hours6am–11pm daily
↗
Good fit for on-site generation

92% of projected solar production is consumed behind the meter.

02 / SOLAR ARRAY

Turn the roof into an asset.

A high-efficiency array that works hardest during the store's busiest, most expensive hours.
MONTHLY LOAD SERVED · STACKED1,010 MWh first year
Solar served Grid supplied
JANMARMAYJULSEPNOV
☼

410 kW DC rooftop array

High-output bifacial modules across the south and west roof planes, optimized for afternoon cooling demand.

754 modules1,010 MWh / yr25 yr warranty
03 / BATTERY STORAGE

Keep the peak in check.

Store clean energy when it's cheap. Dispatch it when demand charges spike.
▦

1.2 MWh / 600 kW

Four-hour duration system
with intelligent peak shaving.

Dispatch-ready 84%
TYPICAL SUMMER DAY
Peak shavingBattery discharge lowers the utility demand peak during the most expensive hours.
DEMAND CONTROL
1,240 kW
6 AM12 PM6 PM11 PM
04 / EV CHARGING

Turn charging visits into customer value.

Observed Orem demand, an EVpin forecast ramp, and a transparent restaurant-sales opportunity for Kneaders.
06 / BUNDLED SCOPES

One coordinated project.

The energy system is the anchor. These practical upgrades make the site more efficient, resilient, and ready for customers.
01

Critter guard

Protects solar wiring and roof areas from birds, squirrels, rodents, nesting, and debris.

$27,500Protection + cleanup included
02

Permanent lighting

Low-profile exterior track lighting with color control, WiFi extenders, and electrical work.

$41,250Branding + security use cases
03

Commercial HVAC

Five high-efficiency units with ducting, installation, and mechanical/electrical integration.

$93,193Buenos Aires Heating & Cooling
04

Project coordination

One schedule, one budget, and one accountable team across solar, storage, HVAC, and charging.

IncludedDesign → permit → commissioning
↗
Why bundle it?

Coordinated construction reduces schedule risk, keeps lender and tax records consistent, and gives the store one point of accountability when scopes overlap.

07 / GRID PARTNERSHIP

Unlock value beyond the meter.

The battery can serve the store every day and become a flexible grid resource when the utility needs it.
01Store loadSolar + battery serve the facility
→
02Torus controlsSecure dispatch + monitoring
→
03Utility signalApproved peak or reliability events
⌁

Virtual power plant pathway

GetEV can bring the site's load, storage, operating reserve, and metering data into a utility conversation. Any rebate, dispatch payment, or bill credit is subject to program approval and final agreements.

Buyer questionWhat is guaranteed today?Peak-demand control and backup capability. VPP revenue is upside, not included in the base case.
08 / INVESTMENT

Every dollar, accounted for.

A transparent turnkey view of the package, before incentives or financing structure.
SCOPEINVESTMENT
410 kW rooftop solar array$820,000
1.2 MWh battery storage$235,000
EV charging infrastructure$125,000
Bundled site improvements$110,000
FULL PROJECT TOTAL$1,290,000
%INCENTIVE VIEWUp to 30%

Illustrative federal clean-energy credit potential. Final eligibility depends on ownership, basis, timing, documentation, and tax review.

Professional tax review recommended before commitment.
05 / ECONOMICS

The business case, at a glance.

Conservative assumptions. Clear upside. Built to hold up in a finance review.
20-YEAR NET VALUE$1.96M

after incentives & operating costs

18.2% IRR
Year 1Year 5Year 10Year 15Year 20
B
Ready when you are.

This proposal is valid for 30 days. We'll handle design, permitting, installation, and monitoring from here.

Total project investment
$1.18M
Year 1 profits
$64.4K
Forecast after operating costs
Payback period
8.7 yrs
After illustrative incentives
CO₂ avoided
1,146 t/yr
Equivalent to 2,802,000 mi